Loading...
17-0824_RICH CONSTRUCTION, INC._Affidavit of PublishingPROOF OF PUBLICATION AFFIDAVIT OF PUBLICATION CITY OF SAN JUAN CAPISTRANO NOTICE INVITING BIDS STATE OF CALIFORNIA, ) RANCHO MAND ANITARY SEWER PIPELINES PROJECT PCIP 17201 WATER SS. NOTICE IS HEREBY GIVEN that The City Council of the City of San Juan Capistrano ("CitY") County of Orange invites and will receive sealed Bids up to but not later than 2 PM on Tuesday September 19, 2017 at City Hall Council Chambers, located at 32400 Paseo Adelanto, San Juan Capistra- no, California, for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for the Rancho Mission I am a citizen of the United States and a resident Viejo Riding Park at San Juan Capistrano Water and Sanitary Sewer Pipelines Proj- ect - CIP 17201 (the °Project'). At said time, Bids will be publicly opened and read aloud. Bids received after said time shall be returned unopened. Bids shall be valid for a Period of 90 of the County aforesaid; I am over the age of calendar days after the Bid opening date. The project involves construction of approximately 2,000 lineal feet of 12 inch PVC eighteen years, and not a party to or interested in domestic waterline and associated appurtenances, including a metering station with removable spool and tie-in connection to the irrigation system a fire hydrant assem- bly and 2 inch water service with connection to customer side piping, approximately 200 lineal feet of 8 inch PVC recycled waterline with pressure reducing station and the above entitled matter. I am the principal clerk two rie in assemblies, approximately 2,200 lineal feet of 8 inch and 200 lineal feet of 12 inch PVC SDR 35 sewer pipeline and thirteen 4 foot diameter concrete sewer of the Capistrano Valley News, a newspaper manholes with polyurethane lining. The project also includes a groundwater meter- ing station with removable spool, with tie-in connections and associated appurtenan- Bidders obtain a copy of the Con- ces. Bids must be submitted on the City's Bid Forms. may tract Documents by accessing the plan room tab on the Coastal Blue website at W W W.a0a5ta that has been adjudged to be a newspaper of Iblue.com. The anticipatedbid set (plans and specifications) cost is $60.00, and may be greater or less at time of bidding. To the extent required by section 20103.7 of the Public Con- tract Code, upon request from a contractor plan room service, the City shall Provide an elec- circulation by the Superior Court of the tgeneral ronic copy of the Contract Documents at no charge to the contractor plan room. County of Orange, State of California, on June 7, It is The responsibility of each prospective bidder to download and Print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a bid. Any Ad- It the responsi- denda will be Posted on the Coastal Blue website at www.coastalblue.com. is bility of each prospective bidder to check www.coostalblue.com on a daily basis through 1984, Case No. A-122949 in and for the City of the close of bids for any applicable addenda or updates. The City does not assume any liabili- ty or responsibility based on any defective or incomplete copying, excerpting, scanning, San Juan Capistrano, County of Orange, State faxing, downloading or printing of the Bid Documents. Information at www.coastalblue.com may change without notice to Prospective bidders. The Contract Documents shall supersede of any information posted or transmitted by www.cDastalblue.com California; that the notice, of which the annexed Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less is a true printed copy, has been published in each than ten Percent (10%)of the submitted Total Bid Price, made payable to City of San Juan Capistrano as bid security. The bid security shall be provided as a guarantee that within five the City provides the successful bidder the Notice of Award, the suc- (5) working days after cessful Bidder will enter into a contract and provide the necessary bonds and certificates of be declared forfeited if the successful Bidder fails to comply Ce regular and entire issue of said newspaper and gwithin insurance. The bid security will said time. No interest will be paid on funds deposited with City. supplement thereof on the following not In any PP g A Non Mandatory Pre-Bid Conference is scheduled for Thursday August 31, 2017 at 10:00 AM to review the Project's existing conditions at City Hall, Council Chambers, 32400 Paseo of the City and consulting engineers, if any, will be present. dates, t0 wit: Adelanto. Representatives Bidders within the writing,nce not andhall becsent to addressed present at CContractsDocuementsBshallrs at the be answered Pre-Bid the Pre-Bid Conference. August 24, September 7, 2017 The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor Bond in an amount equal to one hundred Percent (100%) of the or declare under the penalty Of "I certify ( ) P Y and Material Payment each Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a sur- that meets all State of California bonding requirements, as defined in California ety company Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. perjury under the laws of the State of California Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful for funds withheld by City to ensure its performance that the foregoing is true and correct": Bidder may substitute certain securities under the contract. Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages Executed at Santa Ana, Orange y e Count and the prevailing wage rate for holiday and overtime work applicable in Orange County from the Director of the Department of Industrial Relations for each craft, classification, or these wage rates may be California, On type of worker needed to execute this contra A copy of prevailing ined via the internet at: www.dir.ca. ov/dl_sr obta_ In addition, a copy of The prevailing rate of per diem wages is available at the City Clerk'sOf- fice and shall be made available To interested parties upon request. The successful bidder Date: September 7, 2017 shall post a copy of the Prevailing wage rates at each job site. I1 shall be mandatory upon the and upon any subcontractors, to comply with all Bidder To whom the Contract is awarded, Labor Code provisions, which include but are not limited io the payment of not less than the d tofecantractorsfand n Contract,Ifemploymeln, ofaPPrenlices,ahouroskofslaborland debarment subcontractors. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that to bid on, be listed in a bid proposal, or enter into a contract to perform public work Signature wish must be registered with the Department of Industrial Relations. No Bid will be accepted nor any contract eniered into without proof of the contractor's and subcontractors' current regis- a work. If awarded tration with the Department of Industrial Relations to perform publicre contract, the Bidder and its subcontractors, of any tier, shall maintain active gistration the with the of Industrial Relations for the duration of the Project. Capistrano Valley News This Project is subject to compliance monitoring and enforcement by the Department of In. bidding this Project, it shall be the Bidder's sole responsibility to 2190 S. Towne Centre Pl. dustrial RelaTIons. In on evaluate and include the cost of complying with all labor compliance requirements under this Anaheim, CA 92806 contract and applicable law in its Bid. (714) 796-2209 Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed pursuant to sections 7000 et seq. of the Business and Professions Code in the fol- contractor lowing classification (s) throughout the time it submits its Bid and for the duration of the con- tract: A, C34. Substitution requests shall be made within 35 calendar days after the award of the contract. Pursuant to Public Contract Code Section 3400(b), the City may make findings designating or services by spific brand or trade name other that certain additional materials, methodsec than those listed in the Standard Specifications be used for the Project. Such findings, if any, as well as the materials, methods or services and their specific brand or trade names that be used for the Proiect may be found in the Special Conditions. must City shall award the contract for the Project to the lowest responsive; responsible Bidder as Alone. or inTihe bidding Prjocess. or all the City from or any reserves bids or to irregularities informa ll in ids For further information, contact Mike Marquis, P. E., Project Manager at mmorguis�sgnluancapistrano.org or (949) 443-6326. END OF NOTICE INVITING BIDS Published: The Capistrano Valley News August 24, September 7, 201710997061 AD� lo°R��l NOTICE OF TRANSMITTAL CAPISTRANO VALLEY NEWS Legal Publications CHARGE TO ACCOUNT NO: FOR PUBLICATION ON: DOCUMENT TO BE PUBLISHED PROOF OF PUBLICATION: AUTHORIZED BY DATE: 0041125000 THURSDAY, AUGUST 24, 2017 THURSDAY, SEPTEMBER 7, 2017 NOTICE INVITING BIDS — Rancho Mission Viejo Riding Park at San Juan Capistrano Water and Sanitary Sewer Pipelines Project — CIP 17201 Please fax to: City Clerk's Office, City Hall 32400 Paseo Adelanto San Juan Capistrano, CA 92675 fax (949) 493-1053 telephone (949) 493-1171 /s/ Maria Morris Maria Morris, City Clerk August 15, 2017 Date of Bid Opening - 09/19/2017 Date(s) notice published - 08/24/2017 - 09/07/2017 Date affidavit received - Date notice posted in - 08/24/2017 Designated posting places CITY OF SAN JUAN CAPISTRANO NOTICE INVITING BIDS RANCHO MISSION VIEJO RIDING PARK AT SAN JUAN CAPISTRANO WATER AND SANITARY SEWER PIPELINES PROJECT — CIP 17201 NOTICE IS HEREBY GIVEN that the City Council of the City of San Juan Capistrano ("City") invites and will receive sealed Bids up to but not later than 2 PM on Tuesday September 19, 2017 at City Hall Council Chambers, located at 32400 Paseo Adelanto, San Juan Capistrano, California, for the furnishing to City of all labor, equipment, materials, tools, services, transportation, permits, utilities, and all other items necessary for the Rancho Mission Viejo Riding Park at San Juan Capistrano Water and Sanitary Sewer Pipelines Project — CIP 17201 (the "Project"). At said time, Bids will be publicly opened and read aloud. Bids received after said time shall be returned unopened. Bids shall be valid for a period of 90 calendar days after the Bid opening date. The project involves construction of approximately 2,000 lineal feet of 12 inch PVC domestic waterline and associated appurtenances, including a metering station with removable spool and tie-in connection to the irrigation system a fire hydrant assembly and 2 inch water service with connection to customer side piping, approximately 200 lineal feet of 8 inch PVC recycled waterline with pressure reducing station and two tie in assemblies, approximately 2,200 lineal feet of 8 inch and 200 lineal feet of 12 inch PVC SDR 35 sewer pipeline and thirteen 4 foot diameter concrete sewer manholes with polyurethane lining. The project also includes a groundwater metering station with removable spool, with tie-in connections and associated appurtenances. Bids must be submitted on the City's Bid Forms. Bidders may obtain a copy of the Contract Documents by accessing the plan room tab on the Coastal Blue website at www.coastalblue.com. The anticipated bid set (plans and specifications) cost is $60.00, and may be greater or less at time of bidding. To the extent required by section 20103.7 of the Public Contract Code, upon request from a contractor plan room service, the City shall provide an electronic copy of the Contract Documents at no charge to the contractor plan room. It is the responsibility of each prospective bidder to download and print all Bid Documents for review and to verify the completeness of Bid Documents before submitting a bid. Any Addenda will be posted on the Coastal Blue website at www.coastalblue.com. It is the responsibility of each prospective bidder to check www.coastalblue.com on a daily basis through the close of bids for any applicable addenda or updates. The City does not assume any liability or responsibility based on any defective or incomplete copying, excerpting, scanning, faxing, downloading or printing of the Bid Documents. Information at www.coastalblue.com may change without notice to prospective bidders. The Contract Documents shall supersede any information posted or transmitted by www.coastalblue.com Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of San Juan Capistrano as bid security. The bid security shall be provided as a guarantee that within five (5) working days after the City provides the successful bidder the Notice of Award, the successful Bidder will enter into a contract and provide the necessary bonds and certificates of insurance. The bid security will be declared forfeited if the successful Bidder fails to comply within said time. No interest will be paid on funds deposited with City. A Non Mandatory Pre -Bid Conference is scheduled for Thursday August 31, 2017 at 10:00 AM to review the Project's existing conditions at City Hall, Council Chambers, 32400 Paseo Adelanto. Representatives of the City and consulting engineers, if any, will be present. Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the Contract Documents shall be answered in writing, and shall be sent to all Bidders present at the Pre -Bid Conference. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful Bidder may substitute certain securities for funds withheld by City to ensure its performance under the contract. Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages and the prevailing wage rate for holiday and overtime work applicable in Orange County from the Director of the Department of Industrial Relations for each craft, classification, or type of worker needed to execute this contract. A copy of these prevailing wage rates may be obtained via the internet at: www.dir.ca..qov/dlsr/ In addition, a copy of the prevailing rate of per diem wages is available at the City Clerk's Office and shall be made available to interested parties upon request. The successful bidder shall post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code provisions, which include but are not limited to the payment of not less than the said specified prevailing wage rates to all workers employed by them in the execution of the Contract, employment of apprentices, hours of labor and debarment of contractors and subcontractors. Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be registered with the Department of Industrial Relations. No Bid will be accepted nor any contract entered into without proof of the contractor's and subcontractors' current registration with the Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and its subcontractors, of any tier, shall maintain active registration with the Department of Industrial Relations for the duration of the Project. This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. In bidding on this Project, it shall be the Bidder's sole responsibility to evaluate and include the cost of complying with all labor compliance requirements under this contract and applicable law in its Bid. Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification (s) throughout the time it submits its Bid and for the duration of the contract: A, C34. Substitution requests shall be made within 35 calendar days after the award of the contract. Pursuant to Public Contract Code Section 3400(b), the City may make findings designating that certain additional materials, methods or services by specific brand or trade name other than those listed in the Standard Specifications be used for the Project. Such findings, if any, as well as the materials, methods or services and their specific brand or trade names that must be used for the Project may be found in the Special Conditions. City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by the City from the Base Bid Alone. City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. For further information, contact Mike Marquis, P. E., Project Manager at mmarquis(o)-sanjuancapistrano.org or (949) 443-6326. END OF NOTICE INVITING BIDS