17-0824_RICH CONSTRUCTION, INC._Affidavit of PublishingPROOF OF PUBLICATION
AFFIDAVIT OF PUBLICATION
CITY OF SAN JUAN CAPISTRANO
NOTICE INVITING BIDS
STATE OF CALIFORNIA, )
RANCHO MAND ANITARY SEWER PIPELINES PROJECT PCIP 17201 WATER
SS.
NOTICE IS HEREBY GIVEN that The City Council of the City of San Juan Capistrano ("CitY")
County of Orange
invites and will receive sealed Bids up to but not later than 2 PM on Tuesday September
19, 2017 at City Hall Council Chambers, located at 32400 Paseo Adelanto, San Juan Capistra-
no, California, for the furnishing to City of all labor, equipment, materials, tools, services,
transportation, permits, utilities, and all other items necessary for the Rancho Mission
I am a citizen of the United States and a resident
Viejo Riding Park at San Juan Capistrano Water and Sanitary Sewer Pipelines Proj-
ect - CIP 17201 (the °Project'). At said time, Bids will be publicly opened and read aloud.
Bids received after said time shall be returned unopened. Bids shall be valid for a Period of 90
of the County aforesaid; I am over the age of
calendar days after the Bid opening date.
The project involves construction of approximately 2,000 lineal feet of 12 inch PVC
eighteen years, and not a party to or interested in
domestic waterline and associated appurtenances, including a metering station with
removable spool and tie-in connection to the irrigation system a fire hydrant assem-
bly and 2 inch water service with connection to customer side piping, approximately
200 lineal feet of 8 inch PVC recycled waterline with pressure reducing station and
the above entitled matter. I am the principal clerk
two rie in assemblies, approximately 2,200 lineal feet of 8 inch and 200 lineal feet of
12 inch PVC SDR 35 sewer pipeline and thirteen 4 foot diameter concrete sewer
of the Capistrano Valley News, a newspaper
manholes with polyurethane lining. The project also includes a groundwater meter-
ing station with removable spool, with tie-in connections and associated appurtenan-
Bidders obtain a copy of the Con-
ces. Bids must be submitted on the City's Bid Forms. may
tract Documents by accessing the plan room tab on the Coastal Blue website at W W W.a0a5ta
that has been adjudged to be a newspaper of
Iblue.com. The anticipatedbid set (plans and specifications) cost is $60.00, and may be
greater or less at time of bidding. To the extent required by section 20103.7 of the Public Con-
tract Code, upon request from a contractor plan room service, the City shall Provide an elec-
circulation by the Superior Court of the
tgeneral ronic copy of the Contract Documents at no charge to the contractor plan room.
County of Orange, State of California, on June 7,
It is The responsibility of each prospective bidder to download and Print all Bid Documents
for review and to verify the completeness of Bid Documents before submitting a bid. Any Ad-
It the responsi-
denda will be Posted on the Coastal Blue website at www.coastalblue.com. is
bility of each prospective bidder to check www.coostalblue.com on a daily basis through
1984, Case No. A-122949 in and for the City of
the close of bids for any applicable addenda or updates. The City does not assume any liabili-
ty or responsibility based on any defective or incomplete copying, excerpting, scanning,
San Juan Capistrano, County of Orange, State
faxing, downloading or printing of the Bid Documents. Information at www.coastalblue.com
may change without notice to Prospective bidders. The Contract Documents shall supersede
of
any information posted or transmitted by www.cDastalblue.com
California; that the notice, of which the annexed
Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured
from a surety company satisfactory to the City Council, the amount of which shall not be less
is a true printed copy, has been published in each
than ten Percent (10%)of the submitted Total Bid Price, made payable to City of San Juan
Capistrano as bid security. The bid security shall be provided as a guarantee that within five
the City provides the successful bidder the Notice of Award, the suc-
(5) working days after
cessful Bidder will enter into a contract and provide the necessary bonds and certificates of
be declared forfeited if the successful Bidder fails to comply
Ce
regular and entire issue of said newspaper and
gwithin
insurance. The bid security will
said time. No interest will be paid on funds deposited with City.
supplement thereof on the following
not In any PP g
A Non Mandatory Pre-Bid Conference is scheduled for Thursday August 31, 2017 at 10:00
AM to review the Project's existing conditions at City Hall, Council Chambers, 32400 Paseo
of the City and consulting engineers, if any, will be present.
dates, t0 wit:
Adelanto. Representatives
Bidders within the
writing,nce not andhall becsent to addressed
present at
CContractsDocuementsBshallrs at the be answered Pre-Bid
the Pre-Bid Conference.
August 24, September 7, 2017
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor
Bond in an amount equal to one hundred Percent (100%) of the
or declare under the penalty Of
"I certify ( ) P Y
and Material Payment each
Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a sur-
that meets all State of California bonding requirements, as defined in California
ety company
Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
perjury under the laws of the State of California
Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful
for funds withheld by City to ensure its performance
that the foregoing is true and correct":
Bidder may substitute certain securities
under the contract.
Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages
Executed at Santa Ana, Orange y
e Count
and the prevailing wage rate for holiday and overtime work applicable in Orange County
from the Director of the Department of Industrial Relations for each craft, classification, or
these wage rates may be
California, On
type of worker needed to execute this contra A copy of prevailing
ined via the internet at: www.dir.ca. ov/dl_sr
obta_
In addition, a copy of The prevailing rate of per diem wages is available at the City Clerk'sOf-
fice and shall be made available To interested parties upon request. The successful bidder
Date: September 7, 2017
shall post a copy of the Prevailing wage rates at each job site. I1 shall be mandatory upon the
and upon any subcontractors, to comply with all
Bidder To whom the Contract is awarded,
Labor Code provisions, which include but are not limited io the payment of not less than the
d
tofecantractorsfand
n
Contract,Ifemploymeln, ofaPPrenlices,ahouroskofslaborland debarment
subcontractors.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that
to bid on, be listed in a bid proposal, or enter into a contract to perform public work
Signature
wish
must be registered with the Department of Industrial Relations. No Bid will be accepted nor
any contract eniered into without proof of the contractor's and subcontractors' current regis-
a
work. If awarded
tration with the Department of Industrial Relations to perform publicre
contract, the Bidder and its subcontractors, of any tier, shall maintain active gistration
the
with the of Industrial Relations for the duration of the Project.
Capistrano Valley News
This Project is subject to compliance monitoring and enforcement by the Department of In.
bidding this Project, it shall be the Bidder's sole responsibility to
2190 S. Towne Centre Pl.
dustrial RelaTIons. In on
evaluate and include the cost of complying with all labor compliance requirements under this
Anaheim, CA 92806
contract and applicable law in its Bid.
(714) 796-2209
Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed
pursuant to sections 7000 et seq. of the Business and Professions Code in the fol-
contractor
lowing classification (s) throughout the time it submits its Bid and for the duration of the con-
tract: A, C34.
Substitution requests shall be made within 35 calendar days after the award of the contract.
Pursuant to Public Contract Code Section 3400(b), the City may make findings designating
or services by spific brand or trade name other
that certain additional materials, methodsec
than those listed in the Standard Specifications be used for the Project. Such findings, if any,
as well as the materials, methods or services and their specific brand or trade names that
be used for the Proiect may be found in the Special Conditions.
must
City shall award the contract for the Project to the lowest responsive; responsible Bidder as
Alone.
or inTihe bidding Prjocess. or all
the City from
or any reserves
bids or to irregularities informa ll in ids
For further information, contact Mike Marquis, P. E., Project Manager at
mmorguis�sgnluancapistrano.org or (949) 443-6326.
END OF NOTICE INVITING BIDS
Published: The Capistrano Valley News August 24, September 7, 201710997061
AD� lo°R��l
NOTICE OF TRANSMITTAL
CAPISTRANO VALLEY NEWS
Legal Publications
CHARGE TO ACCOUNT NO:
FOR PUBLICATION ON:
DOCUMENT TO BE PUBLISHED
PROOF OF PUBLICATION:
AUTHORIZED BY
DATE:
0041125000
THURSDAY, AUGUST 24, 2017
THURSDAY, SEPTEMBER 7, 2017
NOTICE INVITING BIDS — Rancho Mission Viejo
Riding Park at San Juan Capistrano Water and
Sanitary Sewer Pipelines Project — CIP 17201
Please fax to:
City Clerk's Office, City Hall
32400 Paseo Adelanto
San Juan Capistrano, CA 92675
fax (949) 493-1053
telephone (949) 493-1171
/s/ Maria Morris
Maria Morris, City Clerk
August 15, 2017
Date of Bid Opening - 09/19/2017
Date(s) notice published - 08/24/2017
- 09/07/2017
Date affidavit received -
Date notice posted in - 08/24/2017
Designated posting places
CITY OF SAN JUAN CAPISTRANO
NOTICE INVITING BIDS
RANCHO MISSION VIEJO RIDING PARK AT SAN JUAN CAPISTRANO WATER
AND SANITARY SEWER PIPELINES PROJECT — CIP 17201
NOTICE IS HEREBY GIVEN that the City Council of the City of San Juan Capistrano ("City")
invites and will receive sealed Bids up to but not later than 2 PM on Tuesday September 19,
2017 at City Hall Council Chambers, located at 32400 Paseo Adelanto, San Juan Capistrano,
California, for the furnishing to City of all labor, equipment, materials, tools, services,
transportation, permits, utilities, and all other items necessary for the Rancho Mission Viejo
Riding Park at San Juan Capistrano Water and Sanitary Sewer Pipelines Project — CIP
17201 (the "Project"). At said time, Bids will be publicly opened and read aloud. Bids received
after said time shall be returned unopened. Bids shall be valid for a period of 90 calendar days
after the Bid opening date.
The project involves construction of approximately 2,000 lineal feet of 12 inch PVC
domestic waterline and associated appurtenances, including a metering station with
removable spool and tie-in connection to the irrigation system a fire hydrant assembly
and 2 inch water service with connection to customer side piping, approximately 200
lineal feet of 8 inch PVC recycled waterline with pressure reducing station and two tie in
assemblies, approximately 2,200 lineal feet of 8 inch and 200 lineal feet of 12 inch PVC
SDR 35 sewer pipeline and thirteen 4 foot diameter concrete sewer manholes with
polyurethane lining. The project also includes a groundwater metering station with
removable spool, with tie-in connections and associated appurtenances. Bids must be
submitted on the City's Bid Forms. Bidders may obtain a copy of the Contract Documents by
accessing the plan room tab on the Coastal Blue website at www.coastalblue.com. The
anticipated bid set (plans and specifications) cost is $60.00, and may be greater or less at time
of bidding. To the extent required by section 20103.7 of the Public Contract Code, upon request
from a contractor plan room service, the City shall provide an electronic copy of the Contract
Documents at no charge to the contractor plan room.
It is the responsibility of each prospective bidder to download and print all Bid Documents for
review and to verify the completeness of Bid Documents before submitting a bid. Any Addenda
will be posted on the Coastal Blue website at www.coastalblue.com. It is the responsibility of
each prospective bidder to check www.coastalblue.com on a daily basis through the close of
bids for any applicable addenda or updates. The City does not assume any liability or
responsibility based on any defective or incomplete copying, excerpting, scanning, faxing,
downloading or printing of the Bid Documents. Information at www.coastalblue.com may change
without notice to prospective bidders. The Contract Documents shall supersede any information
posted or transmitted by www.coastalblue.com
Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured
from a surety company satisfactory to the City Council, the amount of which shall not be less
than ten percent (10%) of the submitted Total Bid Price, made payable to City of San Juan
Capistrano as bid security. The bid security shall be provided as a guarantee that within five (5)
working days after the City provides the successful bidder the Notice of Award, the successful
Bidder will enter into a contract and provide the necessary bonds and certificates of insurance.
The bid security will be declared forfeited if the successful Bidder fails to comply within said
time. No interest will be paid on funds deposited with City.
A Non Mandatory Pre -Bid Conference is scheduled for Thursday August 31, 2017 at 10:00 AM
to review the Project's existing conditions at City Hall, Council Chambers, 32400 Paseo
Adelanto. Representatives of the City and consulting engineers, if any, will be present.
Questions asked by Bidders at the Pre -Bid Conference not specifically addressed within the
Contract Documents shall be answered in writing, and shall be sent to all Bidders present at the
Pre -Bid Conference.
The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and
Material Payment Bond each in an amount equal to one hundred percent (100%) of the
Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety
company that meets all State of California bonding requirements, as defined in California Code
of Civil Procedure Section 995.120, and that is a California admitted surety insurer.
Pursuant to Section 22300 of the Public Contract Code of the State of California, the successful
Bidder may substitute certain securities for funds withheld by City to ensure its performance
under the contract.
Pursuant to Labor Code Section 1773, City has obtained the prevailing rate of per diem wages
and the prevailing wage rate for holiday and overtime work applicable in Orange County from
the Director of the Department of Industrial Relations for each craft, classification, or type of
worker needed to execute this contract. A copy of these prevailing wage rates may be obtained
via the internet at: www.dir.ca..qov/dlsr/
In addition, a copy of the prevailing rate of per diem wages is available at the City Clerk's Office
and shall be made available to interested parties upon request. The successful bidder shall
post a copy of the prevailing wage rates at each job site. It shall be mandatory upon the Bidder
to whom the Contract is awarded, and upon any subcontractors, to comply with all Labor Code
provisions, which include but are not limited to the payment of not less than the said specified
prevailing wage rates to all workers employed by them in the execution of the Contract,
employment of apprentices, hours of labor and debarment of contractors and subcontractors.
Pursuant to Labor Code sections 1725.5 and 1771.1, all contractors and subcontractors that
wish to bid on, be listed in a bid proposal, or enter into a contract to perform public work must be
registered with the Department of Industrial Relations. No Bid will be accepted nor any contract
entered into without proof of the contractor's and subcontractors' current registration with the
Department of Industrial Relations to perform public work. If awarded a contract, the Bidder and
its subcontractors, of any tier, shall maintain active registration with the Department of Industrial
Relations for the duration of the Project.
This Project is subject to compliance monitoring and enforcement by the Department of
Industrial Relations. In bidding on this Project, it shall be the Bidder's sole responsibility to
evaluate and include the cost of complying with all labor compliance requirements under this
contract and applicable law in its Bid.
Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed
contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the
following classification (s) throughout the time it submits its Bid and for the duration of the
contract: A, C34.
Substitution requests shall be made within 35 calendar days after the award of the contract.
Pursuant to Public Contract Code Section 3400(b), the City may make findings designating that
certain additional materials, methods or services by specific brand or trade name other than
those listed in the Standard Specifications be used for the Project. Such findings, if any, as well
as the materials, methods or services and their specific brand or trade names that must be used
for the Project may be found in the Special Conditions.
City shall award the contract for the Project to the lowest responsive, responsible Bidder as
determined by the City from the Base Bid Alone. City reserves the right to reject any or all bids
or to waive any irregularities or informalities in any bids or in the bidding process.
For further information, contact Mike Marquis, P. E., Project Manager at
mmarquis(o)-sanjuancapistrano.org or (949) 443-6326.
END OF NOTICE INVITING BIDS