Loading...
18-0116_SIEMENS INDUSTRY, INC._Contract_Exhibit B61147.91007\30425843.2 1 EXHIBIT “B” Technical Specifications and Scope of Work [Inserted behind this cover page] 61147.91007\30425843.2 2 I. Consultant will perform the following Services: A. Obtain necessary encroachment permits. B. Prepare and manage waste disposal that will comply with City, State, and Federal requirements. C. Comply with all requirements to ensure luminaires receive the applicable rebates and SDGE’s reduced tariff schedule. D. Provide all necessary equipment, hardware, and any other materials for installation of LED street light retrofit kits per attached proposal. E. Deliver final database of installed fixtures in Microsoft Excel format. F. Prepare all documentation required to receive rebates on behalf of the City. G. Collaborate with SDGE to process the tariff change and amend billing records with SDGE. H. Determine loan repayment amounts for the life of the loan. II. As part of the Services, Consultant will prepare and deliver the following tangible work products to the City: A. Project schedule prior to the commencement of work. B. LED retrofit kits, equipment and labor resources C. Representative samples of spare equipment for future use (in stock) for maintenance and warranty purposes. D. GIS database of installed LED equipment, including attributes as detailed in the Investment Grade Audit E. Traffic Control plan to be reviewed and approved by the City’s Public Works Department 61147.91007\30425843.2 3 III. Consultant will keep the City appraised of the status of performance by delivering the following status reports: A. Progress reports to the City staff on a weekly basis. B. Final report to the City following acceptance of the installation. IV. All work product is subject to review and acceptance by the City, and must be revised by the Consultant without additional charge to the City until found satisfactory and accepted by the City. V. Consultant will utilize the following personnel to accomplish the Services: A. Bryan Berlin – Project Manager B. Michael Hutchens – Area Operations Manager C. Richard O’Hearn – Senior Energy Engineer D. Kylon – Energy Engineer E. Alex Valenti – Account Manager F. Street Light Technicians (TBD)