Loading...
17-1017_PALP INC., DBA EXCEL PAVING COMPANY_Addendum #132400 PASEO ADELANTO SAN JUAN CAPISTRANO, CA 92675 (949) 4931171 (949) 4931053 FAX tit wtit.•cantuancap�.cn ano.org ADDENDUM # ONE MEMBERS OF THE CITY COUNCIL SERGIO FARIAS KERRY K. FERGUSON BRIAN L. MARYOTT PAM PATTERSON, ESQ. DEREK REEVE Subject: Del Obispo Street Widening Project — Calle Aspero to Paseo De La Paz CIP 16102 Please note: • Attached page 21 of the project specifications has been corrected to read: Del Obispo Street Widening Project CIP 16102 All other terms and conditions remain the same. FOR THE CITY OF SAN JUAN CAPISTRANO (`-•,riL t it George HI, arez, P.E. Oafe City Engineer San Juan Capistrano: Preserving the Past to Enhance the Future 0 Pooled - 100% recycled paper The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work. In case of discrepancy between the Unit Price and the Item Cost set forth for a unit basis item, the unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the "Item Cost" column, then the amount set forth in the "Item Cost" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the Unit Price. For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices. The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price. B. TOTAL BID PRICE: TOTAL BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES FOR Del Obispo Street Widening Project CIP 16102 Total Bid Price in Numbers Total Bid Price in Written Form In case of discrepancy between the written price and the numerical price, the written price shall prevail. 61147.02100\20950242.3 -21- 00 41 43 - BID FORMS UNIT OF EST. UNIT ITEM ITEM ITEM DESCRIPTION MEASURE QTY. PRICE COST NO. 58. STREET LIGHTING IMPROVEMENTS 1 LS 59. IRRIGATION AND PLANTING 1 LS IMPROVEMENTS The costs for any Work shown or required in the Contract Documents, but not specifically identified as a line item are to be included in the related line items and no additional compensation shall be due to Contractor for the performance of the Work. In case of discrepancy between the Unit Price and the Item Cost set forth for a unit basis item, the unit price shall prevail and shall be utilized as the basis for determining the lowest responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the "Item Cost" column, then the amount set forth in the "Item Cost" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the Unit Price. For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit prices and any apparent errors in the addition of lump sum and extended prices. The estimated quantities for Unit Price items are for purposes of comparing Bids only and the City makes no representation that the actual quantities of work performed will not vary from the estimates. Final payment shall be determined by the Engineer from measured quantities of work performed based upon the Unit Price. B. TOTAL BID PRICE: TOTAL BID PRICE BASED ON BID SCHEDULE TOTAL OF UNIT PRICES FOR Del Obispo Street Widening Project CIP 16102 Total Bid Price in Numbers Total Bid Price in Written Form In case of discrepancy between the written price and the numerical price, the written price shall prevail. 61147.02100\20950242.3 -21- 00 41 43 - BID FORMS