PC Resolution-04-09-14-01PC RESOLUTION NO. 04-9-14-1 REZONE (RZ) 04-07, ARCHITECTURAL CONTROL (AC) 04-05 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO CONDITIONALLY APPROVING ARCHITECTURAL AND SITE DEVELOPMENT PLANS, AND RECOMMENDING CITY COUNCIL APPROVAL OF AMENDMENTS TO STANDARDS OF COMPREHENSIVE DEVELOPMENT PLAN (CDP) 81-01, FORSTER CANYON FOR A 16.73 ACRE PARCEL LOCATED AT THE SOUTH TERMINUS OF VALLE ROAD AND MORE PRECISELY 361-06 (VALLE RANCH) THE R&D (RESEARCH & DEVELOPMENT-OFFICE) DISTRICT REFERRED TO AS A PORTION OF ASSESSORS PARCEL NUMBER 675- Whereas, Centra Realty requests approval of an amendment to the “R&D” (Research & Development-Office) District regulations Section V.D.1 O.f., Development Standards, and specifically, subsection 3(a), Roofs and subsection 8, Minimum Width of Landscaped Areas. Centra Realty also requests approval of preliminary site and architectural plans for a 44,373 square foot, 3-building commercial office complex on a 3.00 acre portion of a 16.73 acre parcel located 1500 feet south of the southern end of Valle Road. The property is General Plan-designated “Planned Community’’ and is zoned “R&D” (Research and Development/Office) Zone District per Comprehensive Development Plan (CDP) 81-01 , Forster Canyon Planned Community; and, L Whereas, the proposed project has been processed pursuant to Section 9- 2.301, Development Review of the Land Use Code; and, Whereas, the Environmental Administrator has determined that the project‘s potential impacts have been fully addressed through the previously certified Final Environmental Impact Report for Pacific Point and the executed Development Agreement, determined that the project is exempt from Department of Fish and Game Fees, and referred the site and architectural plans to the Design Review Committee and the Planning Commission, referred potential text amendments for the Comprehensive Development Plan to the City Council; and, Whereas, the Design Review Committee conducted a duly-noticed public meeting on July 1, 2004 pursuant to the provisions of Title 9, Land Use Code, Section 9- 2.339, Public Meeting Procedures to consider public testimony on the proposed project and recommended conditional approval; and, Whereas, the Planning Commission conducted a duly-noticed public hearing on September 14,2004 pursuant to Title 9, Land Use Code, Section 9-2.335, City Council Policy 5, and Planning Department Policy 510 to consider public testimony on the proposed project and has considered all relevant public comments. - PC Resolution 04-9-14-1 2 September 14,2004 NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings with respect to the Rezone application: 1. The proposed zone change is consistent with the General Plan goals, policies, and objectives, in particular, the provisions of the Land Use Element and the Community Design Element because the proposed amendments to the development standards will allow office development consistent with the General Plan land use designation for the property, and include appropriate criteria to assure consistency with the purpose and intent of the R&D (Research & Development-Office) District and the Pacific Point Design Guidelines. 2. The proposed zone change is consistent with the General Plan designation for the project site because the proposed text amendments will facilitate the development of office uses which are consistent with the General Plan's Planned Community designation and the development of "light industrial" pursuant to Table LU-3, Planned Communities, Allowable Use Guidelines; and, 3. The proposed zone change will result in the development of land uses suitable to the property's unique situation including natural and man-made constraints because the proposed text amendments will result in development standards which will allow site development consistent with the project site's natural and man-made constraints; and, 4. The proposed zone change will be compatible with the existing land uses and/or zoning classifications of adjoining properties or properties in the vicinity of the property being rezoned which could potentially be affected by development because the proposed development standards will maintain compatibility of the proposed project with existing and proposed adjoining land uses; and, NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings with respect to the Architectural Control application: I. The project plans comply with all provisions of Title 9 of the San Juan Capistrano Municipal Code and the provisions of the R&D (Research & Development-Office) District established by the Comprehensive Development Plan (CDP) 81 -01, Forster Canyon Planned Community subject to the conditions of approval contained herein and the proposed amendments to the development standards; and, 2. The architectural and general design of the project is generally consistent with the goals, policies and objectives of the Community Design Element and applicable provisions of the General Plan because the proposed project complies with the Pacific Point Design Guidelines and the R&D (Research & Development-Office) L PC Resolution 04-9-14-1 3 September 14,2004 District development standards established to assure Title 9, Land Use Code consistency and General Plan consistency; and, 3. The site plan is compatible with surrounding existing and proposed land uses because existing residential land uses to the east on McCracken Hill are buffered by substantial physical separation from the project, and immediately adjoining land uses will consist of commercial offices; and, 4. The general design considerations, including the character, scale and quality of the design are consistent with the adopted Architectural Design Guidelines of the City, because the Pacific Point Design Guidelines were developed to assure consistency with the City's Architectural Design Guidelines; and, 5. The site plan is functional and safe in regards to existing or mitigated off-site conditions as they relate to adequacy of vehicular, bicycle and pedestrian circulation because off-site road improvements are required to be constructed by the project, access has been designed from Valle Road consistent with City standards, and the parking design and pedestrian circulation have been designed to minimize potential conflicts; and, 6. The general landscape design, including the location, type, size, color, texture and coverage of plant materials provide visual relief to complement buildings and structures consistent with the Pacific Point Design Guidelines. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano hereby recommends approval of the proposed amendments to Comprehensive Development Plan (CDP) 81 -01, Forster Canyon as provided by Exhibit A, attached hereto and incorporated herein; and furthermore, that the Planning Commission of the City of San Juan Capistrano hereby approves Architectural Control (AC) 03-05 subject to the following conditions of approval: PLANNING DEPARTMENT 1. Because of the parcel status of the property as a remnant from a deed acquisition by a school district, the property owner shall secure approval of and record a certificate of compliance, or a subdivision map prior to issuance of any building permit. 2. Prior to building permit issuance, the project architectural and site development plans shall be reviewed for substantial compliance with the Planning Commission's conditionally approved plans prepared by Ware Malcomb Architects subject to approval by the Planning Director or hidher designee. 3. Prior to building permit issuance, the project plans shall provide that the built-up portion of the proposed parapet-style roof will be finished in a color and material that PC Resolution 04-9-14-1 4 September 14,2004 L 4. 5. 6. 7. 8. L matches or approximates the proposed roof tile color to create visual uniformity of the roof element. Prior to building permit issuance, the project shall secure Design Review Committee (DRC) review and approval of: a architectural details including wall sections, windows, doors, eaves which shall be compatible with the design of the Capistrano Unified School District (CUSD) Ancillary Facility. a sign program which identifies the location, size, sign type, font style(s), and color(s) for all proposed signs. two-piece, variegated, Spanish roof tile (manufacturer and style of the roof tile). pedestrian bollard and wall sconce lighting fixtures which shall be compatible with those proposed for the Capistrano Unified School District (CUSD) Ancillary Facility. The parking lot lighting shall consist of Kim Lighting, ERA 17 or 25 fixtures mounted on "swept arm" fixture supports. All pole-mounted fixtures shall be affixed with cut-offs to control glare and spillage. revised landscape plan that (I ) provides two off-set rows of silverberry, with ceanothus or toyon bordering the parking lot, along the 1-5 frontage; and (2) limits the use of the Mexican fan palms and date palms to the proposed courtyard between Buildings 2-3. Trees shall be a variety of sizes, with a minimum height of 12 feet when planted. e e e e The illumination level of all parking lot lighting shall be reduced by one-half (Vi) after 1O:OO p.m. in the evening. Prior to building permit issuance, the project plans shall include provisions for all required Transportation Demand Management (TDM) facilities consistent with Section 9-3.555 of Title 9, Land Use Code, including rideshare information area, preferential parking, secure bike storage, and (employee) shower facilities. Prior to issuance of any occupancy permit, the project shall complete the installation of all required TDM improvements subject to inspection by the Planning Director or hidher designee. Prior to building permit issuance, building permit plans and specifications shall be designed to incorporate all noise attenuation measures established by an acoustic report subject to review and approval by the Planning Director or hidher designee. Prior to the issuance of any building permit, the project shall submit a waste management plan in the format provided by the City including site plans depicting container location(s) collecting and storing on-site, recyclable refuse during construction and post-construction. Prior to issuance of any building permit, the project shall provide storage containers for on-site source separation of recyclable construction refuse consistent with the approved waste management plan. Prior to PC Resolution 04-9-14-1 5 September 14,2004 u 9. IO. 11. building permit issuance, the project plans shall depict the area for recycling space allocation per Title 9, Land Use Code, Section 9-3.537. Prior to issuance of a Certificate of Occupancy, the applicant shall submit solid waste generation tonnages, disposal, and recycling records for construction activity to the City.” Prior to building permit issuance for any site utilities or structures, the project site plans shall indicate the precise location of the “geotechnical setback zone”. All proposed utilities shall be situated outside that zone. Prior to building permit issuance, the applicant will prepare and submit an Historic Depiction Program (HDP) pursuant to City Council Policy 606. Prior to issuance of the final certificate of occupancy, the project shall complete the installation of the Historic Depiction Program plan Prior to any building or grading permit issuance, the applicant shall pay all necessary funds to eliminate any outstanding developer deposit account deficit. ENGINEERING & BUILDING DEPARTMENT Prior to Issuance of Grading and Right-of-way Improvement Permits: 2.1 Pav Fees. Prior to issuance of grading and right-of-way improvement permits, the applicant shall fulfill all applicable fee requirements in accordance with the City Municipal Code and shall post securities to insure satisfaction performance (Engr.). v 2.2 Soils/Geoloqv Report. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer and Building Official for their review and obtain approval for a Soils ReporVGeotechnical Feasibility Study, prepared by a Registered Geologist and/or Soil Engineer, to determine the seismic safety and soils stability of all proposed grading and development improvements within the project as well as any affected adjacent property. The Report shall also indicate substructure bedding/backfill recommendations for driveways and parking lot areas. (Engr.). 2.3 Grading Plans. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer and Building Official for their review and obtain approval for Grading Plans prepared by a Registered Civil Engineer. These plans shall show the limits of grading, drainage, sewer, water and driveways. The extent of the topography shall be extended enough to determine the drainage impacts to adjacent properties. The elevations shall correspond with the Orange County benchmark datum. Unless determined otherwise by the City Engineer, runoff must be filtered with Best Management Practices (BMP’s) methods then conveyed to the street or to a City approved drainage facility. (Engr.). 2.4. Storm Runoff, Hvdraulic/Hydrolonv Calculations. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer for review W PC Resolution 04-9-14-1 6 September 14,2004 and shall obtain approval for a Storm Runoff study, prepared by a Registered Civil Engineer, showing existing and proposed facilities, hydraulic and hydrologic calculations and the methods of draining on-site and tributary areas without exceeding the capacity of any affected street, facility or natural swale. Said study shall be consistent with the City's Master Drainage Plan in accordance with all applicable City regulations, OCPF&RD design criteria, and standards. (Engr.). b 2.5. Erosion and Sediment Control Plans. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer for review and shall obtain approval for Erosion and Sediment Control Plans, prepared by a Registered Civil Engineer. These plans shall show all temporary and/or permanent erosion and sediment control measures in accordance with the NPDES Permit. (Engr.). 2.6. Water Quality Requirements and Compliance. Prior to issuance of grading and right- of-way improvement permits, the applicant shall submit to the City Engineer for review and shall obtain approval for a Water Quality Management Plan (WQMP), specifically identifying structural and non-structural Best Management Practices (BMP's) that will be used on-site to control predictable pollutant runoff. The applicant shall obtain and follow the City of San Juan Capistrano's WQMP outline and instructions. The applicant shall also comply with all the requirements of the latest NPDES Permit, the City's Water Quality Ordinance and the Clean Water Act. (Engr.). b 2.7. Submit Haul Route Plan. For importation /exportation of soil in and out of the project site, prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer for review and obtain approval for, a Haul Route Plan specific to the project and in compliance with all applicable City standards. (Engr.). 2.8. Obtain Haul Route Permit. For importation /exportation of soil in and out of the project site, prior to issuance of grading and right-of-way improvement permits, the applicant shall submit a permit application, provide security deposit and obtain a Haul Route Permit from the Engineering Division which will specify the dates and times and head ways for hauling activities. (Engr.). 2.9 Construction Mitigation Proqram. Prior to issuance of grading and right-of-way improvement permits, the developer shall prepare and ad here to a construction mitigation program, approved by the Planning Director and Engineering and Building Director, containing the following controls and shall post a $2,000 cash deposit with the City for roadway cleaning purposes. Said deposit shall remain with the City for the entire duration of the project's construction phase: (Bldg & Planning). 2.9.1 Grading: a. Haul route, if applicable, for the movement of on and off-site of heavy earth-moving equipment. PC Resolution 04-9-14-1 7 September 14,2004 L b. Location of assembly and storage/service areas of heavy earth- moving equipment and limits of hours of operation. c. Worker controlled access to site, including hours of work, limits on noise sources, and dust and soil import/export. d. Compliance with environmental mitigation measures. e. Construction Waste and Materials Management. f. Placement of dumpsters and portable toilets to be on-site only. 2.9.2 Enforcement: a. The Planning Director and Engineering and Building Director may modify the construction mitigation program standards if on-site observations indicate that construction activities are creating a nuisance to adjacent property developments. b. The applicant shall designate a project enforcement person approved by the Engineering and Building Director to ensure compliance with the Construction Mitigation Program. c. If it is determined that the applicant is in violation of the approved construction mitigation program, the Planning Director andlor the Engineering and Building Director are authorized to shut down the project by reason of said violation. Prior to Issuance of First Building Permit: 3.1 Pav Fees. Prior to issuance of the first Building permit, the applicant shall fulfill all applicable fee requirements in accordance with the City Municipal Code, including, but not limited to the applicable Capistrano Circulation Fee Program and the sewer Capacity fees. (Engr.). 3.2. Valle Road Terminus - Improvement Plans. Prior to issuance of the first Building Permit, and in accordance with “Partial Assignment and Assumption of Development Agreement and Estoppel” recorded April 7, 2004, the developer of Tract 14196 shall submit to the City Engineer for review, and shall obtain approval for, Street Improvement Plans for Valle Road Southerly Terminus. Said plans shall be prepared by a Registered Civil Engineer and shall show all existing and proposed improvements. Said Valle Road Southerly Terminus shall be extended southerly and easterly (as necessary) so as to eliminate or minimize that section of private property located between the McCracken Hill call box and the proposed street terminus. Any deviation from this condition shall be subject to review and approval by the City Engineer. (Engr.) W PC Resolution 04-9-14-1 8 September 14,2004 3.3. Sewer and Water Plans. Prior to issuance of the first Building Permit, the applicant shall submit to the City Engineer, for review and obtain approval for a Site Plan prepared by a Registered Civil Engineer showing the sewer and water service lines and their corresponding points of connection with the City public main lines. Each building shall have a sampling handhole for wastewater testing. Any required extension to the existing public sewer and water main lines, if deemed necessary by the City Engineer, shall be constructed by the applicant and at applicant‘s cost. All on-site water facilities behind the water meter shall be privately owned and maintained, including the fire protection system. The plan shall be specific to the project, which reflects consistency with the City’s Sewer and Water standards. Any public sewer and water easement dedication, as deemed applicable by the City Engineer, shall have a minimum width of twenty feet and shall comply with the City’s rules and regulations. (Engr.). 3.4 Sewer Easement Dedication. Prior to issuance of the first Building permit, the applicant shall prepare and submit to the City Engineer all required documentation for the dedication of a twenty-foot wide easement to the City of San Juan Capistrano for public sewer purposes. Said easement shall extend from the northern boundary of the project to the terminal public sewer manhole (final alignment to be submitted for review and determination by the City Engineer). Dedication of easement shall be at no cost to the City. (Engr.). Prior to Issuance of the First Certificate of Occupancy: 4.1 Access Easement and Maintenance Aareement. Prior to issuance of the first certificate of occupancy, the applicant shall provide to the City Engineer all the necessary documentation for the access easement and maintenance agreement with the adjacent northerly property (CUSD - Capistrano Ancillary Facility). (Engr.). 4.2. Installation of Landscapins. Prior to issuance of the first certificate of occupancy, the applicant shall install all landscaping and irrigation, including the easterly slopes. The developer shall provide a certification, from a licensed Landscape Architect, stating that the landscape materials and irrigation system (tested for full coverage) have been planted and installed in compliance with the approved landscape plans (Planning & Engr.). 4.3. Construction of Off-site Circulation Imorovements. Prior to issuance of the first certificate of occupancy, and in accordance with “Partial Assignment and Assumption of Development Agreement and Estoppel” recorded April 7, 2004, the developer of Tract 141 96 shall construct the following off-site traffic circulation improvements: (Engr.). a. Construct intersection improvements and signalization at Camino Las Ramblas and Via California. b. Widen Valle Road between San Juan Creek Road and the 1-5 ramps including traffic signal and power pole relocations, necessary grading, PC Resolution 04-9-14-1 9 September 14,2004 L- retaining walls and slope landscaping, and right-of-way acquisition, if applicable. c. Widen Valle Road between 1-5 ramps and Forster Ranch Road to commuter standards, including necessary grading, retaining walls, and landscaping, and right-of-way acquisition, if applicable. d. Construct intersection improvements and signalization of Valle Road/La Novia and 1-5 Northbound Ramps including realignment of La Novia Avenue, grading and landscaping, and right-of-way acquisition, if applicable. e. Construct improvements and signal modifications of Camino Capistrano @ San Juan Creek Road to provide an additional northbound right turn lane, subject to Caltrans approval. f. Construct improvements and signal modifications at Camino Capistrano and 1-5 Southbound Ramps to provide an additional lane for combined rightheft turns from the southbound off-ramp subject to Caltrans approval. 4.4. Participation in Off-site Circulation Improvements. Prior to issuance of the first certificate of occupancy, and in accordance with “Partial Assignment and Assumption of Development Agreement and Estoppel” recorded April 7, 2004, the developer of Tract 141 96 shall pay required fair-share for the following off-site traffic circulation improvement: (Engr.). W a. Pay Fair Share toward the existing La Novia Avenue Extension from Valle Road to 2500 feet easterly. Prior to Issuance of Second Certificate of Occupancy: 5.1 Construction and Participation Of Off-Site Circulation Improvements. Prior to issuance of the second (2nd) certificate of occupancy, and in accordance with “Partial Assignment and Assumption of Development Agreement and Estoppel” recorded April 7, 2004, the developer of Tract 141 96 shall construct the following off-site traffic circulation improvements: (Engr.). a. Widen La Novia Avenue to secondary standards, from Valle Road to 2500 feet easterly. Prior to Issuance of Final Certificate of Occupancy: 6.1 Completion of all Improvements to the City’s Satisfaction. Prior to issuance of the final certificate of occupancy, the applicant shall complete, to the satisfaction of the City Engineer, all facility improvements, necessary to serve the development in accordance with the approved plan and approved exceptions. (Engr.). PC Resolution 04-9-14-1 10 September 14,2004 L' 6.2 Provision of As-Built Mvlars Plans/Digital Format. Prior to issuance of the final certificate of occupancy, the applicant shall submit to the City Engineer for review and obtain approval for the reproducible Mylar "As Built" Plans of all applicable improvement works completed and accepted. Said plans shall be prepared by a Registered Civil Engineer. Additionally, the applicant shall submit digital copies of all "As Built" plans in accordance with the latest edition of the City of San Juan Capistrano Digital Submission Standards. (Engr.). PUBLIC WORKS DEPARTMENT-WATER DIVISION Prior to Issuance of Grading and Right-of-way Improvement Permits: 1 .I Water Improvement Agreement. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall execute a Water Improvement Agreement with the City, shall pay all applicable domestic and non-domestic Water Development Charges in accordance with the Water Division Schedule of Rates. and Charges, as last revised, and shall post the required securities to insure satisfactory performance of proposed public water improvements in compliance with City water standard specifications. (Water) 1.2 Fire Flow Demands. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall obtain from the Orange County Fire Authority (OCFA) the required fire flow demands and fire protection requirements to serve the subject project and shall provide evidence of satisfactory fire flow. (Water) u 1.3 Dedication of Water Facilities. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall dedicate, at no cost to the City, all public water facilities, water rights, and any required easements to the City for related project improvements. (Water) 1.4 Water Improvement Plans. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall submit to the City Engineer and the Public Works Director for review, and shall obtain approval for, sewer and water plans prepared by a Registered Civil Engineer. These plans shall be specific to the project and shall reflect consistency with the City's Sewer and Water Master Plans, City municipal codes, standards, specifications, and City water standard specifications. The sewer plans shall indicate that all proposed sewer manholes shall be lined with polyurethane, or equal approved material, at the applicant's cost to the satisfaction of the City Engineer (Engr. & Water) 2. Prior to Issuance of Building Permits: 2.1 Prior to the issuance of any tenant improvement building permits, the applicant shall complete the construction of all domestic water system, non-domestic (recycled) water system improvements, and irrigation facilities required to serve the subject --...-, - PC Resolution 04-9-14-1 11 September 14,2004 2.2 2.3 3. - 3.1 project in compliance with City municipal codes, standards, specifications, the Rules and Regulations for Users of Non-domestic Water and the City’s water standard specifications. (Water) Prior to the issuance of any tenant improvement building permits, and in accordance with “Partial Assignment and Assumption of Development Agreement and Estoppel” recorded April 7,2004, the developer of Tract 141 96 shall be responsible a 16-inch fully welded steel water main that is cement mortar lined & coated (CML&C) water main from the 16-inch main that crosses 1-5 to the existing 8-inch water main in Valle Road in accordance the Water Facilities Agreement for SunCal Properties, section A.1.c. This water main shall be constructed with a sacrificial anode cathodic protection or an acceptable alternative corrosion resistant water system as approved by the Water Engineering Manager. Prior to the issuance of any tenant improvement building permits, the applicant shall be responsible to design all landscaping and irrigation that are identified as a non- domestic (recycled) water use in accordance to the City water standard specifications, the Rules and Regulations for Users of Non-domestic Water, and the City Municipal Code 9-3.61 7. Prior to Issuance of Certificate of Occupancy: Prior to the acceptance of water, sewer, storm drain, and street improvements and release of performance securities, the applicant shall submit to the City Engineer and the Public Works Director for review and obtain approval for reproducible “Record Drawing” mylar plans that call out any deviations from the signed plans of all the domestic water system, non-domestic (recycled) water system, and the landscape irrigation system, sewer, storm drain, and street improvements. These “Record Drawings” are also required to be provided to the City in digital format, in accordance with the “City of San Juan Capistrano Digital Submission Standards”. ORANGE COUNTY FIRE AUTHORITY I. Prior to building permit issuance, the project will submit and secure approval of a site plans and architectural plans from the Orange County Fire Authority (OCFA) which address final design of fire hydrant locations, fire access, sprinklers, emergency evacuation, and related fire safety factors consistent with the Orange County Fire Authority non-residential fire protection standards and consistent with the Orange County Fire Authority conditions of approval. Prior to issuance of any Certificate of Occupancy, the project shall complete the installation of all site improvements consistent with the approved fire protection plan and subject to inspection and approval of the Orange County Fire Authority. PC Resolution 04-9-14-1 12 September 14,2004 EFFECTIVE DATE & FINAL APPROVAL: The project approval of the Architectural Control (AC) application shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application, and following City Council approval of the requested amendments to the R&D (Research & Development- Office) District development standards. Should the City Council deny or revise any part of the requested Rezone (RZ) application, such that a significant redesign of the buildings or site plan is necessary, such redesign shall be referred back to the Planning Commission for reconsideration of the AC approval. L. The appeal period on the Architectural Control (AC) application shall expire at 500 pm, Wednesday, September 29,2004. This project approval shall be valid for a period of one year from the date of approval of this resolution, and shall expire on September 14,2005 unless a time extension request or building/grading permit application related to this discretionary approval is submitted to the City prior to that date. PASSED, APPROVED AND ADOPTED this 14" day of September, 2004, by the following vote, to wit: AYES: Commissioners Cohen, Drey and Ratcliffe, and Vice Chairman Cardoza NOES: None ABSENT: Chairman Neely v ABSTAIN: None P:\Planning\Archive\AC PROJECTS\Ac0405ValleRanch\ac0405-PC-resO4-9-14-1 -final.doc