Loading...
PC Resolution-04-06-22-02PC RESOLUTION NO. 04-6-22-2 REZONE (RZ) 04-04. ARCHITECTURAL CONTROL (AC) 03-05 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF SAN JUAN CAPISTRANO CONDITIONALLY APPROVING ARCHITECTURAL AND SITE DEVELOPMENT PLANS, AND RECOMMENDING CITY COUNCIL APPROVAL OF AMENDMENTS TO THE R&D (RESEARCH & DEVELOPMENT-OFFICE) DISTRICT STANDARDS OF COMPREHENSIVE DEVELOPMENT PLAN (CDP) 81 -01, FORSTER CANYON FOR A 17.38 ACRE PARCEL LOCATED AT THE SOUTH TERMINUS OF VALLE ROAD AND MORE PRECISELY (CAP ISTRANO ANCILLARY FACILITY) REFERRED TO AS ASSESSORS PARCEL NUMBER 675-361-06 Whereas, Capistrano Unified School District (CUSD) requests approval of a rezone application to amend the R&D (Research and DevelopmenVOffice) Districts development standards established by the Forster Canyon Comprehensive Development Plan (CDP 81-01); and, approval of site and architectural plans for a proposed 125,388 gross square feet (GSF) administrative office complex for the Capistrano Unified School District consisting of 118,557 square feet (SF) of office, 4,524 SF of school board hearing room, and 2,307 SF of warehouse space for a 17.28 acre parcel located at the south terminus of Valle Road; and, Whereas, the proposed project has been processed pursuant to Section 9- 2.301, Development Review of the Land Use Code; and, u Whereas, on September 23, 2003, the Environmental Administrator determined that the project's potential impacts had been fully addressed through the previously certified Final Environmental Impact Report for Pacific Point and the executed Development Agreement, determined that the project is exempt from Department of Fish and Game Fees, and referred the site and architectural plans to the Design Review Committee and the Planning Commission, referred potential text amendments for the Comprehensive Development Plan to the City Council; and, Whereas, the Design Review Committee conducted duly-noticed public meetings on March 18 and May 6, 2004 pursuant to the provisions of Title 9, Land Use Code, Section 9-2.339, Public Meeting Procedures to consider public testimony on the proposed project and recommended conditional approval; and, Whereas, the Planning Commission conducted a duly-noticed public meeting on June 8, 2004 pursuant to the provisions of Title 9, Land Use Code, Section 9-2.339, Public Meeting Procedures, Administrative Policy 409, and Planning Department Policy 510 to consider public testimony on the proposed project and has considered all relevant public comment; and, Whereas, the Planning Commission conducted a duly-noticed public hearing on June 22,2004 pursuant to Title 9, Land Use Code, Section 9-2.335, City Council Policy 5, and Planning Department Policy 510 to consider public testimony on the proposed project and has considered all relevant public comments. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings with respect to -u the Rezone application: PC Resolution 04-6-22-2 2 June 22,2004 . 1. 2. 3. 4. 5. The proposed zone change is consistent with the General Plan goals, policies, and objectives, in particular, the provisions of the Land Use Element and the Community Design Element because the recommended development standards will allow office development consistent with the General Plan land use designation for the property, and the recommended development standards include appropriate criteria to assure consistency with the purpose and intent of the R&D (Research & Development- Office) District and the Pacific Point Design Guidelines. The proposed zone change is consistent with the General Plan designation for the project site because the text amendments will facilitate the development of office use which is consistent with the General Plan's Planned Community designation and the development of "light industrial" pursuant to Table LU-3, Planned Communities, Allowable Use Guidelines; and, The proposed zone change will result in the development of land uses suitable to the property's unique situation including natural and man-made constraints because the recommended text amendments will result in development standards which will allow site development consistent with the project site's natural and man-made constraints; and, The proposed zone change will be compatible with the existing land uses and/or zoning classifications of adjoining properties or properties in the vicinity of the property being rezoned which could potentially be affected by development because the recommended development standards will maintain compatibility of the proposed project with existing and proposed adjoining land uses; and, The proposed amendment to the building height standard from a maximum of 35 feet to 39 feet represents a policy issue which the Planning Commission defers to the legislative discretion of the City Council; further, two Planning Commissioners recommended no change to the existing height limitation of 35 feet, and two Commissioners recommended an increase in the height limit to no more than 37 feet. NOW, THEREFORE, BE IT RESOLVED, that the Planning Commission of the City of San Juan Capistrano does hereby make the following findings with respect to the Architectural Control application : I. The project plans comply with all provisions of Title 9 of the San Juan Capistrano Municipal Code and the provisions of the R&D (Research & Development-Office) District established by the Comprehensive Development Plan (CDP) 81-01 , Forster Canyon Planned Community subject to the conditions of approval contained herein and the recommended amendments to the development standards; and, 2. The architectural and general design of the project is generally consistent with the goals, policies and objectives of the Community Design Element and applicable provisions of the General Plan because the proposed project complies with the Pacific Point Design Guidelines and the R&D (Research & Development-Office) District development standards established to assure Title 9, Land Use Code consistency and General Plan consistency; and, PC Resolution 04-6-22-2 3 June 22,2004 3. The site plan is compatible with surrounding existing and proposed land uses because existing residential land uses to the east on McCracken Hill are buffered by substantial physical separation from the project, and immediately adjoining land uses will consist of commercial offices; and, 4. The general design considerations, including the character, scale and quality of the design are consistent with the adopted Architectural Design Guidelines of the City, because the Pacific Point Design Guidelines were developed, in large part, from the City's Architectural Design Guidelines; and, The site plan is functional and safe in regards to existing or mitigated off-site conditions as they relate to adequacy of vehicular, bicycle and pedestrian circulation because off-site road improvements are required to be constructed by the project, access has been designed from Valle Road consistent with City standards, and the parking design and pedestrian circulation have been designed to minimize potential conflicts; and, 5. 6. The general landscape design, including the location, type, size, color, texture and coverage of plant materials provide visual relief to complement buildings and structures consistent with the Pacific Point Design Guidelines. NOW, THEREFORE, BE IT FURTHER RESOLVED, that the Planning Commission of the City of San Juan Capistrano hereby recommends approval of amendments to Comprehensive Development Plan (CDP) 81-01, Forster Canyon as provided by Exhibit A, attached hereto and incorporated herein; and furthermore, that the Planning Commission of the City of San Juan Capistrano hereby approves Architectural Control (AC) 03-05 subject to the following conditions of approval: PLANNING DEPARTMENT 1. 2. 3. 4. Prior to building permit issuance, the project architectural and site development plans shall be reviewed for substantial compliance with the Planning Commission's conditionally approved plans prepared by PJHM Architects for the Capistrano Ancillary Facility subject to approval by the Planning Director or hidher designee. Prior to building permit issuance, the project color palette shall be subject to review and approval by the Design Review Committee. Prior to Certificate of Occupancy, the project shall be inspected for compliance with the Design Review Committee- approved color pallette. Prior to building permit issuance, the project shall prepare and submit design plans and/or specifications for architectural details including windows, doors, decorative paving, arch & column details, balconies, and the tower element design which shall be subject to Design Review Committee review and approval. The applicant shall provide both 1-5 and courtyard elevations of at least two alternative designs for the proposed tower element. Prior to building permit issuance, the final lighting plans shall be subject to Design Review Committee review and approval. Final lighting plans shall comply with the following: L 'v PC Resolution 04-6-22-2 4 June 22,2004 No building mounted lighting along the west (M), north, or south elevations of the proposed buildings. No accent lighting of any type on the proposed tower element. Lighting between the proposed buildings and 1-5 shall be restricted to bollard lighting along the west edge of the emergency access drive, oriented toward the building and completely shielded from 1-5. a. b. c. Prior to building permit issuance, building permit plans for lighting shall be subject to review for substantial compliance with the Design Review Committee-approved lighting plans with respect to style of lighting, location of fixtures, type of lighting, and wattage. All pole-mounted fixtures shall be affixed with cut-offs to control glare and spillage. Prior to building permit issuance, the applicant shall submit final landscape plans for the 1-5 frontage transitional slope treatment which shall be subject to Design Review Committee review and approval. The landscape plans shall provide an appropriate density and plant palette which provide visual buffering of the proposed buildings and which are complimentary to the existing natural slope planting on the project site. 5. Prior to building permit issuance, the project final landscape plans shall be subject to review and approval by the Planning Director or their designee to determine substantial compliance with the Design Review Committee-approved landscape plans with respect to type, size, and location, and density of all ornamental plantings. Any significant deviation in the final landscape plans from the Design Review Com m ittee-a p proved preliminary landscape plans shall requ ire additional Design Review Committee review and approval. Prior to building permit issuance, the project plans shall include provisions for all required Transportation Demand Management (TDM) facilities including rideshare information area, preferential parking, rideshare passenger loading, secure bike storage, (employee) shower facilities, and central lunchroom consistent with the approved TDM Plan. 6. Priorto issuance of any occupancy permit, the project shall complete the installation of all TDM improvements subject to inspection by the Planning Director or their designee. At such future time that Orange County Transportation Authority (OCTA) should provide bus service to the District property, the District shall construct a bus turnout to City and/or OCTA standards subject to design plans reviewed and approved by the City Engineer and the Planning Director. 7. Prior to building permit issuance, the project shall submit an acoustic report for the proposed structures which demonstrates that the building design will provide appropriate attenuation of 1-5 noise impacts and maintain interior ambient noise at a level consistent with the City=s noise standards. The acoustic report shall include specific recommendations on proposed window glazing and wall insulation subject to review and approval by the Planning Director. Prior to building permit issuance, the project's building permit plans and specifications shall be designed to incorporate all recommended noise attenuation measures established by the approved acoustic report. u PC Resolution 04-6-22-2 5 June 22,2004 ENGINEERING & BUILDING DEPARTMENT 2.1 2.2 2.3. 2.4. 2.5. 2.6. 2.7. Pav Fees. Prior to issuance of grading and right-of-way improvement permits, the applicant shall fulfill all applicable fee requirements in accordance with the City Municipal Code and the Capistrano Valley Water District Standard Specifications and shall post securities to insure satisfaction performance (Engr.). SoilslGeoloav Report. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer and Building Official for their review and obtain approval for a Soils ReporUGeotechnicaI Feasibility Study, prepared by a Registered Geologist and/or Soil Engineer, to determine the seismic safety and soils stability of all proposed grading and development improvements within the project as well as any affected adjacent property. The Report shall also indicate substructure bedding/backfill recommendations for driveways and parking lot areas. (Engr.). Gradinq Plans. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer and Building Official for their review and obtain approval for Grading Plans prepared by a Registered Civil Engineer. These plans shall show the limits of grading, drainage, sewer, water and driveways. The extent of the topography shall be extended enough to determine the drainage impacts to adjacent properties. The elevations shall correspond with the Orange County benchmark datum. Unless determined otherwise by the City Engineer, runoff must be filtered with Best Management Practices(BMP=s) methods then conveyed to the street or to a City approved drainage facility. (Engr.). Erosion and Sediment Control. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer for review and shall obtain approval for Erosion and Sediment Control Plans, prepared by a Registered Civil Engineer. These plans shall show all temporary and/or permanent erosion and sediment control measures in accordance with the NPDES Permit. (Engr.). Water Qualitv Requirements and Compliance. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit to the City Engineer for review and shall obtain approval for a Water Quality Management Plan (WQMP), specifically identifying structural and non-structural Best Management Practices (BMP's) that will be used on-site to control predictable pollutant runoff. The applicant shall obtain and follow the City of San Juan Capistrano=s WQMP outline and instructions. The applicant shall also comply with all the requirements of the latest NPDES Permit, the City's Water Quality Ordinance and the Clean Water Act.(Engr.). Submit Haul Route Plan. For importation / exportation of soil in and out of the project site, the applicant shall submit to the City Engineer for review and obtain approval for, a Haul Route Plan specific to the project and in compliance with all applicable City standards. (Engr.). Obtain Haul Route Permit. Prior to issuance of grading and right-of-way improvement permits, the applicant shall submit a permit application, provide . ‘4 PC Resolution 04-6-22-2 6 June 22,2004 security deposit and obtain a Haul Route Permit from the Engineering Division which will specify the dates and times and head ways for hauling activities. (Engr.). 2.8. Construction Mitigation Proaram. Prior to issuance of grading and right-of-way improvement permits, the developer shall prepare and ad here to a construction mitigation program, approved bythe Planning Director and Engineering and Building Director, containing the following controls and shall post a $5,000 cash deposit with the City for roadway cleaning purposes. Said deposit shall remain with the City for the entire duration of the project=s construction phase: (Engr & Planning). 2.8-1 Grading: a. Haul route, if applicable, for the movement of on and off-site of heavy earth-moving equipment. b. Location of assembly and storagekervice areas of heavy earth-moving equipment and limits of hours of operation. c. Worker controlled access to site, including hours of work, limits on noise sources, and dust and soil imporVexport. d. Compliance with environmental mitigation measures. e. Construction Waste and Materials Management. f. Placement of dumpsters and portable toilets to be on-site only. 2.8-2 Enforcement: a. The Planning Director and Engineering and Building Director may modify the construction mitigation program standards if on-site observations indicate that construction activities are creating a nuisance to adjacent property developments. b. The applicant shall hire a project enforcement person approved by the Engineering and Building Director to ensure compliance with the Construction Mitigation Program. c. If it is determined that the applicant is in violation of the approved construction mitigation program, the Planning Director and/or the Engineering and Building Director are authorized to shut down the project by reason of said violation. Prior to Issuance of First Building Permit 3.1. ProPertv Frontaaes - Improvement Plans. Prior to issuance of the first Building Permit, the applicant shall submit to the City Engineer for review, and shall obtain approval for, Street Improvement Plans for Valle Road Southerly Terminus. Said plans shall be prepared by a Registered Civil Engineer and shall show all existing and proposed improvements. Said Valle Road Southerly Terminus shall be extended southerly and easterly (as necessary) so as to eliminate or minimize that section of private property located between the McCracken Hill call box and the v PC Resolution 04-6-22-2 7 June 22,2004 proposed street terminus. The applicant shall dedicate on the final map all necessary access easements, located outside the proposed right-of-way, to the McCracken Hill Home Owners Association, and shall dedicate, in fee, to the City, all necessary sections of public right-of way for street purposes. Any deviation from road design, associated with this condition, shall be subject to specific review and approval by the City Engineer. (Engr.) 3.2. Sewer and Water. The applicant shall submit to the City Engineer, for review and obtain approval for a Site Plan prepared by a Registered Civil Engineer showing the sewer and water service lines and their corresponding points of connection with the City public main lines. Any required extension to the existing public sewer and water main lines, if deemed necessary by the City Engineer, shall be constructed by the applicant and at applicant's cost. All on-site water facilities behind the water meter shall be privately owned and maintained, including the fire protection system. The plan shall be specific to the project which reflects consistency with the City's Sewer and Water standards. Any Sewer and water easement dedication, if applicable, shall comply with the City's rules and regulations. (Engr.). Prior to Issuance of Certificate of Occupancy for the First Building 4.1. 4.2. 4.3. Installation of Landscapina. Prior to issuance of certificate of occupancy, the applicant shall install all landscaping and irrigation. The developer shall provide a certification, from a licensed Landscape Architect, stating that the landscape materials and irrigation system (tested for full coverage) have been planted and installed in compliance with the approved landscape plans (Planning & Engr.). Sewer Easement Dedication. Prior to issuance of the first Building permit, the applicant shall prepare and submit to the City Engineer all required documentation for the dedication of a twenty foot wide easement to the City of San Juan Capistrano for public sewer purposes. Said easement shall extend from the right - of-way line at the terminus/cul-de-sac of Valle Road, through the entire property, to the southern boundary of the project (final alignment to be submitted for review and determination by the City Engineer. Dedication of easement shall be at no cost to the City. (Engr.). Construction and ParticiDation of Off-site Circulation Improvements. Prior to issuance of the first certificate of occupancy, the applicant shall construct the following off-site traffic circulation improvements: (Engr.). 1. Construct intersection improvements and signalization at Camino Las Ramblas and Via California. 2. Widen Valle Road between San Juan Creek Road and the 1-5 ramps including traffic signal and power pole relocations, necessary grading, retaining walls and slope landscaping, and right-of-way acquisition, if applicable. 3. Widen Valle Road between 1-5 ramps and Forester Ranch Road to commuter standards, including necessary grading, retaining walls, and landscaping, and right-of-way acquisition, if applicable. PC Resolution 04-6-22-2 8 June 22,2004 L 4. Construct intersection improvements and signalization of Valle RoadlLa Novia and 1-5 Northbound Ramps including realignment of La Novia Avenue, grading and landscaping, and right-of-way acquisition, if applicable. Construct improvements and signal modifications of Camino Capistrano @ San Juan Creek Road to provide an additional northbound right turn lane, subject to Caltrans approval. 5. 6. Construct improvements and signal modifications at Camino Capistrano and 1-5 Southbound Ramps to provide an additional lane for combined rightheft turns from the southbound off-ramp subject to Caltrans approval. 7. Pay Fair Share toward the existing La Novia Avenue Extension from Valle Road to 2500 feet easterly. Prior to Issuance of Certificate of Occupancy for the Second Building 5.1 . Construction and Participation of Off-site Circulation Improvements. Prior to issuance of the second certificate of occupancy, the applicant shall construct the following off-site traffic circulation improvements: (Engr.). a. Widen La Novia Avenue to secondary standards, from Valle Road to 2500 feet easterly. W b. Construct intersection improvements and signalization at San Juan Creek Road and Valle Road. 5.2. Complete all Improvements to the Citv's Satisfaction. Prior to issuance of certificate of occupancy, the applicant shall complete, to the satisfaction of the City Engineer, all facility improvements, necessary to serve the development in accordance with the approved plan and approved exceptions.(Engr.). 5.3. Provide As-Built Mvlars/Digital Format. Prior to issuance of certificate of occupancy, the applicant shall submit to the City Engineer for review and obtain approval for the reproducible "As Built" Plans of all applicable improvement works completed and accepted. Said plan shall be prepared by a Registered Civil Engineer. Additionally, the applicant shall submit digital copies of all "As Built" plans in accordance with the latest edition of the City of San Juan Capistrano Digital Submission Standards. (Engr.). WATER DIVISION 1. Prior to Issuance of Grading and Right-of-way Improvement Permits 1.1 Water Improvement Agreement. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall execute a Water Improvement Agreement with the City, shall pay all applicable domestic and non-domestic Water Development Charges in accordance with the Water Division Schedule of Rates and Charges, as last revised, and shall post the required securities to insure satisfactory performance of proposed public water improvements in compliance with City water standard specifications. (Water) W PC Resolution 04-6-22-2 9 June 22,2004 1.2 1.3 1.4 2. 2.1 2.2 2.3 2.4 2.5 Fire Flow Demands. Priorto the issuance of grading and right-of-way improvements permits, the applicant shall obtain from the Orange County Fire Authority (OCFA) the required fire flow demands and fire protection requirements to serve the subject project and shall provide evidence of satisfactory fire flow. (Water) Dedication of Water Facilities. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall dedicate, at no cost to the City, all public water facilities, water rights, and any required easements to the City for related project improvements. (Water) Water lmwovement Plans. Prior to the issuance of grading and right-of-way improvements permits, the applicant shall submit to the City Engineer and the Public Works Director for review, and shall obtain approval for, sewer and water plans prepared by a Registered Civil Engineer. These plans shall be specific to the project and shall reflect consistency with the City's Sewer and Water Master Plans, City municipal codes, standards, specifications, and City water standard specifications. The sewer plans shall indicate that all proposed sewer manholes shall be lined with polyurethane, or equal approved material, at the applicant's cost to the satisfaction of the City Engineer (Engr. & Water) Prior to Issuance of Building Permits Prior to the issuance of building permits, the applicant shall complete the construction of all domestic water system, non-domestic (recycled) water system improvements, and irrigation facilities required to serve the subject project in compliance with City municipal codes, standards, specifications, the Rules and Regulations for Users of Non-domestic Water and the City=s water standard specifications. (Water) Prior to the issuance of building permits, the applicant shall be responsible to construct a 16-inch fully welded steel water main that is cement mortar lined 8, coated (CML&C) water main from the 16-inch main that crosses 1-5 to the existing 8-inch water main in Vale Road in accordance the Water Facilities Agreement for SunCal Properties, section A.1.c. This water main shall be constructed with a sacrificial anode cathodic protection or an acceptable alternative corrosion resistant water system as approved by the Water Engineering Manager. (Water) Prior to the issuance of building permits, the applicant shall validate the fire flow requirements can be provided from the connection to the 16-inch water via the 1-5 crossing or construct a 12-inch connection to the 460 HGL water system in McCracken Hill with a pressure reducing station (PRS) to the 250 HGL water pressure zone. (Water) Prior to the issuance of building permits, the applicant shall construct and accommodate water extensions (stub-outs) and facilities to the property to the south that are sized to provide for the required fire flow requirements to said parcel. (Water) Prior to the issuance of a building permit, the applicant shall enter into a developer reimbursement agreement for any upsizing of the 12-inch water main to the 460 1 PC Resolution 04-6-22-2 10 June 22,2004 HGL water pressure to a 16-inch water main in the extent that the 16-inch used for an inlet / outlet water main to the 250 south reservoir. (Water) 2.6 3. 3.1 Priorto the issuance of building permits, the applicant shall be responsible to design all landscaping and irrigation that are identified as a non-domestic (recycled) water use in accordance to the City water standard specifications, the Rules and Regulationsfor Users of Non-domestic Water, and the City Municipal Code 9-3.61 7. (Water) Prior to Issuance of Certificate of Occupancy Prior to the acceptance of water, sewer, storm drain, and street improvements and release of performance securities, the applicant shall submit to the City Engineer and the Public Works Director for review and obtain approval for reproducible Record Drawing mylar plans that call out any deviations from the signed plans of all the domestic water system, non-domestic (recycled) water system, and the landscape irrigation system, sewer, storm drain, and street improvements. These Record Drawings are also required to be provided to the City in digital format, in accordance with the City of San Juan Capistrano Digital Submission Standards. (Water) ORANGE COUNTY FIRE AUTHORITY 1. Prior to building permit issuance, the project will submit and secure approval of a site plans and architectural plans from the Orange County Fire Authority (OCFA) which address final design of fire hydrant locations, fire access, sprinklers, emergency evacuation, and related fire safety factors consistent with the Orange County Fire Authority non-residential fire protection standards and consistent with the Orange County Fire Authority conditions of approval per the August 3,2003 on the subject project from Lynne Pivaroff, Fire Prevention Analyst, OCFA. Prior to issuance of any Certificate of Occupancy, the project shall complete the installation of all site improvements consistent with the approved fire protection plan and subject to inspection and approval of the Orange County Fire Authority. EFFECTIVE DATE & FINAL APPROVAL: The project approval of the Architectural Control (AC) application shall become effective following expiration of the fifteen (15) day appeal period without filing of an appeal application, and following City Council approval of the requested amendments to the R&D (Research & Development- Office) District development standards. Should the City Council deny or revise any part of the requested Rezone (RZ) application, such that a significant redesign of the buildings or site plan is necessary, such redesign shall be referred back to the Planning Commission for reconsideration of the AC approval. The appeal period on the Architectural Control (AC) application shall expire at 500 pm, Wednesday, July 7,2004. This project approval shall be valid for a period of one year from the date of approval of this resolution, and shall expire on June 22, 2005 unless a time extension request or building/grading permit application related to this discretionary approval is submitted to the City prior to that date. PC Resolution 04-6-22-2 11 June 22,2004 PASSED, APPROVED AND ADOPTED this 22nd day of June, 2004, by the following vote, to wit: AYES: Commissioners Robert Cardoza, Sheldon Cohen, Gene Ratcliffe, and Chairman Timothy Neely NOES: none ABSTAIN: none ABSENT: none (P:\Plannng!Archive!AC PROJECTS\Ac0305CUSDo~ces\ac0305PC-res-04-6-22-2.wpd) EXHIBIT A .-- REZONE (RZ) 04-04, AMENDMENTS TO COMPREHENSIVE DEVELOPMENT PLAN (CDP) 81-01, FORSTER CANYON PLANNED COMMUNITY "R&D" (RESEARCH & DEVELOPMENT-OFFICE) DISTRICT STANDARDS Section V(D)(g)(f)(Z)(a), Development Standards, Height Limits is hereby amended as follows: (a) Building Height: Two Stories. 35-0". Vertical architectural elements including towers or similar features may be permitted based on a determination by the Design Review Committee that the proposed height is in scale with the overall architectural design and in no case, exceeds a maximum of 48'-0". or (a) Building Height: Two Stories. 35'-0", provided that buildings may be constructed to a maximum of 37'-0" subject to the following criteria: a e e Buildings shall have a minimum floor area of 50,000 gross square feet. Buildings shall be limited to general office use, corporate office use, and research & development use. Buildings shall be designed with a maximum 28'-0" top-of-wall height. Vertical architectural elements including towers or similar features may be permitted based on a determination by the Design Review Committee that the proposed height is in scale with the overall architectural design and in no case, exceeds a maximum of 48'-0". or (a) Building Height: Two Stories. 35'-0", provided that buildings may be constructed to a maximum of 39'-0" subject to the following criteria: a e a Buildings shall have a minimum floor area of 50,000 gross square feet. Buildings shall be limited to general office use, corporate office use, and research & development use. Buildings shall be designed with a maximum 28'-0'' top-of-wall height. Vertical architectural elements including towers or similar features may be permitted based on a determination by the Design Review Committee that the proposed height is in scale with the overall architectural design and in no case, exceeds a maximum of 48’-0”. Section V(D)(9)(f)(2)(e), Development Standards, Height Limits is hereby amended as follows: (e) Light Standards: All exterior lighting shall comply with the provisions Section 9-3.529, Lighting standards of the Title 9, Land Use Code. Section V(D)(9)(f)(3)(c), Development Standards, Roofs is hereby amended as follows: (c) Roof mounted equipment shall only be permitted subject to compliance with the following design criteria: 0 0 0 0 0 equipment shall consist of large, “boxcar”-style units with no exterior conduit and a maximum of two units per roof well. equipment shall be painted to match the roof color and will be screened by the roof parapet. equipment shall be painted a flat color matching the roof color. the parapet floor below the equipment shall be finished with the same material as the roofing. equipment shall be subject to a line-of-sight analysis prior to building permit issuance to determine that the parapet design will fully screen the equipment from views from McCracken Hill. Otherwise, roof-mounted equipment shall be prohibited. All ground-mounted mechanical equipment shall be fully screened with enclosures integrated with the architecture. Section V(D)(9)(f)(4)(a), Development Standards, Wall Plan Relief is hereby amended as follows: (a) Wall plane articulation: Building architecture shall include design elements which provide both vertical and horizontal building wall plane articulation and provide variation in roof planes. Section V(D)(9)(f)(8)(d), Development Standards, Minimum Width of Landscaped Areas is hereby amended as follows: (d) Between Entry Road and Parking Areas: minimum setbacks shall be established by the Design Review Committee as part of the review of the preliminary landscape plans. P:\PlanningWrchive\AC PROJECTS\AcO305CUSDoffices~cO305-ExhibitA.wpd